Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-07
6
Cabling the Line Ports and Completing the
Installation
Revised: July 27, 2009, OL-7824-07
Introduction
This chapter provides instructions for cabling the Gigabit Ethernet ports for both one and two SCE 2000
topologies, and for configuring Gigabit Ethernet (GBE) interface parameters. In a topology utilizing two
SCE 2000 s (cascade), this includes the cascade ports as well as the line ports.
Note
When installing a cascaded system, it is extremely important to follow the sequence of procedures
outlined in the section
How to Install a Cascaded System, page 6-10
Note
When installing an External Optical Bypass module, the SCE 2000 line ports are connected to the
module. Refer to
How to Cable the External Optical Bypass Module, page A-5
for complete instructions.
•
Connecting the Line Ports to the Network, page 6-1
•
Information About Cascaded Systems, page 6-10
•
How to Install a Service Control Application, page 6-14
Connecting the Line Ports to the Network
•
•
How to Configure the GBE Interface Parameters, page 6-7
•
How to Cable the GBE Line Interface Ports, page 6-7
•
•