SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-02
6-1
This chapter provides instructions for cabling the Gigabit Ethernet ports for both one and two
SCE 2000
topologies, and for configuring Gigabit Ethernet (GBE) interface parameters. In a
topology utilizing two
SCE 2000
s (cascade), this includes the cascade ports as well as the line
ports.
Note
When installing a cascaded system, it is extremely important to follow the sequence of procedures
outlined in the section
Installing a Cascaded System
(on page
6-12
).
Note
When installing an External Optical Bypass module, the
SCE 2000
line ports are connected to the
module. See
Cabling the External Optical Bypass Module
(on page
A-6
) for complete instructions.
This chapter contains the following sections:
•
Connecting the line ports to the network
6-1
•
Installing a Cascaded System
6-12
•
Loading and Activating a Service Control Application
6-16
Connecting the line ports to the network
The procedures for cabling the line ports, configuring the interface parameters, and testing
connectivity of the links are explained in the following sections:
•
Cabling Diagrams
(on page
6-2
)
•
Configuring the GBE Interface Parameters
(on page
6-7
)
•
Connecting the GBE Line Interface Ports
(on page
6-8
)
•
Testing Connectivity: Examining Link LEDs, GBE Counters
("
Testing Connectivity:
Examining Link LEDs and Counters
" on page
6-10
)
C H A P T E R 6
Cabling the Line Ports and Completing the
Installation