Contents
SCE 2000 4xGBE Installation and Configuration Guide
ii
OL-7824-02
Functionality 3-2
Number of links 3-2
Redundancy 3-2
Link Continuity 3-3
Physical Topologies 3-4
Single SCE 2000 Topologies 3-4
Two Cascaded SCE 2000s For Dual Links 3-6
Topology-Related Parameters 3-7
Installation and Maintenance 4-1
Preparing to Install the SCE 2000 Platform 4-1
Tools and Parts Required 4-2
Site Requirement Guidelines 4-3
Installing the SCE 2000 Platform 4-4
Installation Precautions 4-5
Installing the SCE 2000 on a Workbench or Tabletop 4-6
Rack-Mounting a SCE 2000 Platform 4-7
Attaching a Chassis Ground Connection 4-13
Power Supply Overview 4-16
LEDs 4-17
Power Supply Specifications 4-18
Removing and Replacing a Power Supply Unit 4-19
Powering Down the Power Supply Unit and Disconnecting Input Power 4-19
Removing the Power Supply Unit 4-21
Replacing the Power Supply Unit 4-21
Reconnecting the Power 4-22
Fan Module Overview 4-25
Removing and Replacing the Fan Module 4-25
Replacing the Battery 4-28
Connecting the Management Interfaces and Performing Initial System
Configuration 5-1
Connecting the Local Console 5-1
Setting Up the Local Console 5-2
Initial System Configuration 5-3