Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-02
4-9
Figure 4-5: Attaching the Mounting Brackets (2-post)
Step 3
Repeat steps 1 and 2 on the other side of the
SCE 2000
.
This completes the steps for attaching the rack-mount brackets to the
SCE 2000
.
If mounting the
SCE 2000
in a rack with only two posts, skip to
Mounting the System to a Rack
(Mounting
the System to a Rack "
Mounting the System to the Rack
" on page
4-11
).
If mounting the
SCE 2000
in a rack with four posts, proceed to the next step to attach the crossrail supports
to the rack.
Attaching the Crossrail Supports to the Rack
When mounting in a rack with four posts (front and back) the two crossrail supports are mounted
one on each side of the rack. The
SCE 2000
then slides into these crossrails, which support the
weight of the unit.
Note
Cisco recommends that you allow at least 1 or 2 inches (2.54 or 5.08 cm) of vertical clearance between
the
SCE 2000
and any equipment directly above and below it.