3-9
Cisco 3700 Series Routers Hardware Installation Guide
OL-2180-08
Chapter 3 Installing the Router
Installing the Chassis Ground Connection
•
For NEC-compliant grounding, use size AWG 14 (2 mm
2
) or larger wire and an appropriate
user-supplied ring terminal.
•
For EN/IEC 60950-compliant grounding, use size AWG 18 (1 mm
2
) or larger wire and an
appropriate user-supplied ring terminal.
For chassis grounding instruction, see one of the following sections:
•
Cisco 3725 Router Ground Connection, page 3-9
•
Cisco 3745 Router Ground Connection, page 3-10
Cisco 3725 Router Ground Connection
To install the ground connection for a Cisco 3725 router, perform the following steps:
Step 1
Strip one end of the ground wire to the length required for the ground lug or terminal.
•
For the NEBS ground lug—approximately 0.75 inch (20 mm)
•
For user-provided ring terminal—as required
Step 2
Crimp the ground wire to the ground lug or ring terminal, using a crimp tool of the appropriate size.
Step 3
Attach the ground lug or ring terminal to the chassis as shown in
Figure 3-12
or
Figure 3-13
. For a
ground lug, use the two screws with captive locking washers provided. For a ring terminal, use one of
the screws provided. Use a number 2 Phillips screwdriver, and tighten the screws to a torque of 8 to
10 in-lb (0.9 to 1.1 N-m).
Step 4
Connect the other end of the ground wire to a grounding point at your site.
Figure 3-12
NEBS-Compliant Ground Wire Connection on a Cisco 3725 Router Chassis
SEE MANU
AL BEFORE INST
ALLATION
AL
CD
LP
RD
TD
SEE MANU
AL BEFORE INST
ALLATION
DSU
56K
AL
CD
LP
RD
TD
SEE MANU
AL BEFORE INST
ALLATION
DSU
56K
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLAT
ION
CTRLR E2
CTRLR E1
AL
LP
CD
1
2
BAN
NM-HDV
1
2
Ground lug