95-01-01
Page 50
Serials 1423 thru 1624 before SB2X-95-18
EFFECTIVITY:
C I R R U S
C O M P O N E N T M A I N T E N A N C E M A N U A L - C A P S
M O D E L S R 2 0
4 May 2015
Figure 95-01-0111
Rocket Installation - Serials 1423 thru 1624 before SB2X-95-18 (6 of 10)
19
Serials 1423 thru 1624 before SB2X-95-18.
11
11
2
12
13
RETAINING GROOVE
(REF)
RETAINING GROOVE
(REF)
14
9
10
11
11
6
LEGEND
2. Washer
6. Rocket Lanyard
9. Pick-up Collar
10. Pick-up Collar Support
11. Screw
12. Rocket Cone
13. Activation Cable
14. Plug
15. Launch Tube
16. Rocket Motor
19. Cone Adapter
23. Shelf Assembly
15
16
Position inspection hole on rocket cone so that hole faces
forward once installed.
Position retaining groove of pick-up collar support to rocket lanyard.
Pivot pick-up collar support until the rocket lanyard engages the
opposite retaining groove.
Do not overtighten aluminum tension screws.
Torque to 1 - 5 in-lb (12 - 56 Ncm).
Position rocket lanyard around top outer diameter
of pick-up collar support, NOT over top of the rocket.
Failure to comply will absolutely FAIL rocket deployment!
NOTE
Verify anchor blocks are perpendicular to pick-up collar
assembly. If pick-up collar assembly is not fully seated
against the anchor blocks, use pliers to gently adjust
anchor blocks as required.
2
23
11
SR20_CM95_1816D
ROCKET IGNITER
(REF)
FIRING PIN ACTUATOR
(REF)
6
ANCHOR BLOCK
(REF)
Apply light threadlocker to screws.
Apply medium threadlocker to screws.
Upon disassembly, safety the rocket motor by wiring firing pin
actuator to rocket igniter.