25
2 — P L AC I N G T H E C H A R G E P O I N T TO T H E F I N A L LO CAT I O N
Once the Charge Point is free from the pallet, there are two options to move it to the
final location.
a) Move the Charge Point with eyebolts
Steps:
1- Take off the 10 x M6 nuts that are keeping the cover, lift a little the cover and disconnect
the 3G antenna connector, courtesy light connector and the exhaust fan connector.
2- Remove totally the cover from the top of the Charge Point.
3- Locate and make sure that the eyebolts provided are strongly tight.
Step 1
Step 2
Step 3
Summary of Contents for CCS CHA T2C63
Page 1: ...Installation Manual Raption Series ...
Page 2: ......
Page 4: ......
Page 7: ...03 ...
Page 17: ...13 ...
Page 18: ...14 Raption Series Installation Manual 3 A Dimensions Units specified in milimeters ...
Page 53: ...49 ...