26
Raption Series Installation Manual
Steps:
4- Hold the sling to the eyebolts, raise the Charge Point up and placed on the final
location.
5- Screw the 4 x M16 nuts with washers on the threaded rods already installed on
the base (on both sides),
replace the isolation top hat seal with the one provided
to assure IP (the tightening torque has to be 3.5 Nm)
, place again the unit cover,
connect the 3G antenna connector, courtesy light connector and the exhaust fan
connector and assembly the decorative front panel.
Note:
do not remove the eyebolts from the Charge Point, leave it under the cover.
Step 4
Step 5
Summary of Contents for CCS CHA T2C63
Page 1: ...Installation Manual Raption Series ...
Page 2: ......
Page 4: ......
Page 7: ...03 ...
Page 17: ...13 ...
Page 18: ...14 Raption Series Installation Manual 3 A Dimensions Units specified in milimeters ...
Page 53: ...49 ...