Blitz 45 - 50 - 55
4-2012
72
If the value measured exceeds 5 cm, tighten the belt tightener screw, up to get the minimum length
(4 cm).
13.8 - MAIN TANK FASTENING BELT
The adjustment of the belts takes place during the first 3÷4 hours of use of the
atomizer; after this period check and restore the correct tension of the belts so
that the perfect block of the main tank to the frame will be guaranteed, this way
preventing any damages or breakups of the tank itself.
Check the tension of the fixing belts of the main tank to the frame. To restore the correct tension of
the belts screw in the register screw (4) on both sides of the tank.
13.7 - PUMP BELT TENSIONER
Check length “L” of the spring (refer to picture): it should be in tension between
4 and 5
cm.
®
+
-
ON
ON
OFF
OFF
Spin
Remote Control
H O
2
Press.
Pump
00631
00231
L = 4 ÷ 5 cm
LEGEND
1 - FRONT BELT
2 - REAR BELT
3 - SAFETY PIN
4 - REGISTER SCREW
500
600
700
800
900
900
400
300
200
100
100
00241
2
1
2
3
4
Summary of Contents for BLITZ 45
Page 4: ......
Page 43: ...4 2012 Blitz 45 50 55 35 01169 01171 01170...
Page 102: ...Blitz 45 50 55 4 2012 NOTES...