
Blitz 45 - 50 - 55
4-2012
68
13
MAINTENANCE OPERATIONS
13
ALL OPERATIONS MUST BE CARRIED OUT WITH THE ENGINE SWITCHED OFF AND WITH
THE IGNITION KEY REMOVED FROM THE CONTROL PANEL.
The machine has to be periodically revised according to the country rules. The
inspections and the release of the certificate have to be made by special provided
structure of the country where the machine is used.
13.1 - LUBRICATION
Carefully clean the greasing nipples and the oil filler in order to avoid that, during
lubrication, dirt might be introduced. In the case of intensive use of the machine,
reduce the lubrication intervals.
BLITZ007
Maintenance Point
Action
Consumption material
Periodicity
Fan shaft belt support
Check Oil
Oil SAE 90
8 hours
Fan belt-tensioner support
Greasing
Grease Tipo EP Class NLGI 2
200 hours
Free wheel
Greasing
Grease Tipo EP Class NLGI 2
200 hours
Wheel hubs
Greasing
Grease Tipo EP Class NLGI 2
200 hours
Support foot
Greasing
Grease Tipo EP Class NLGI 2
200 hours
Steering drawbar
Greasing
Grease Tipo EP Class NLGI 2
200 hours
Fan shaft bearings support
Change oil
Oil SAE 90
1 year
00065
00631
®
+
-
ON
ON
OFF
OFF
Spin
Remote Control
H O
2
Press.
Pump
00065
00065
OIL
MAX
MIN
8 h
CONTROLLARE
CHECK
CONTRÔLER
CONTROLAR
95079
00282
00065
FAN SHAFT BEARINGS SUPPORT
WHEEL HUB
SUPPORT
FOOT
FREE WHEEL
FAN BELT
TENSIONER
SUPPORT
Summary of Contents for BLITZ 45
Page 4: ......
Page 43: ...4 2012 Blitz 45 50 55 35 01169 01171 01170...
Page 102: ...Blitz 45 50 55 4 2012 NOTES...