![Cima BLITZ 45 Operation And Maintenance Instruction Download Page 26](http://html1.mh-extra.com/html/cima/blitz-45/blitz-45_operation-and-maintenance-instruction_2607111026.webp)
Blitz 45 - 50 - 55
4-2012
18
AXLE
. It is fastened by means of four bolts to the frame. The axle can be mounted in two different
positions, so modifying the wheel base between the wheels and the drawbar. The wheels’ axle shafts,
inserted in the frame axle and locked there by some especially foreseen screws, allow to regulate
the
track width
, by adapting it to the intervention requirements.
— The height with respect to the ground can be regulated. (The misalignment between the axle shaft
and the wheels’ hub allows a variation of 12 cm). It is enough to turn the axle shafts.
00295
LOCKING
SCREWS
500
600
700
800
900
400
300
200
100
00253
After every regulation, carefully tighten all the screws and the bolts concerned by
the intervention. THE RESPONSIBILITY FOR THE REGULATION, ASSEMBLY AND
DISASSEMBLY OPERATIONS OF THE WHEELS IS CHARGED TO THE OPERATOR, WHO
HAS TO PREPARE AND TO ASSURE THE NECESSARY CONDITIONS FOR A COMPLETE
SAFETY AGAINST ANY POSSIBLE ACCIDENT.
WHEELS
. The wheels’ hubs are equipped with grease nipples for the bearings lubrication (see 14.1).
The tyres’ size and the operating pressure are indicated at step 4.5.2.
HEAD PROTECTION RING.
It is applied behind the machine, in order to protect the distribution devices
(heads). It has to be mounted in the most efficacious position, according with the working conditions
and with the kind of head.
Summary of Contents for BLITZ 45
Page 4: ......
Page 43: ...4 2012 Blitz 45 50 55 35 01169 01171 01170...
Page 102: ...Blitz 45 50 55 4 2012 NOTES...