PCB CONNECTORS
12-2 0-5461
SERVICE MANUAL
180
SERVICE MANUAL
180
JP1 Header Pin
Pin function
Signal
1
PDA signal which is used to detect a short circuit at
the welding terminals
5V = No short at welding terminals; 0.2V = Short at
welding terminals
5 VDC
2
OUTA IGBT 1/2/3/4 PWM drive signal, 15V p-p square
wave signal
15 VDC pk
3
OUTB IGBT 1/2/3/4 PWM drive signal, 15V p-p square
wave signal
15 VDC pk
4
Vcc = +15V supply
+15 VDC
5
0V
0 VDC
6
0V
0 VDC
7
0V
0 VDC
8
Thermostat signal to Control PCB
2.5 VDC (Tr.1 closed)
5 VDC (Tr.1 open)
9
OUTA IGBT 1/2/3/4 PWM drive signal, 15V p-p square
wave signal
15 VDC pk
10
OUTB IGBT 1/2/3/4 PWM drive signal, 15V p-p square
wave signal
15 VDC pk
11
Vcc = +15V supply
15 VDC
12
+5V supply from Control PCB
+5 VDC
13
PEAK-IFB Primary current feedback signal to control
weld current
14
PEAK-IFB Primary current feedback signal to control
weld current
Table 12-4 JP1 Header pin function (connects to MB header on control PCB)
Power Terminal Name
Pin function
Signal
P1
Active 240 VAC connection, 6.35mm QC tab, to soft
start circuit
240 VAC
P8
Active 240 VAC connection, 6.35mm QC tab, from soft
start circuit
240 VAC
DC+
Rectified DC+
Mains voltage
from EMC/Rectifier PCB
+340VDC
DC-
Rectified DC-
Mains voltage
from EMC/Rectifier PCB
0VDC
EARTH tab
Mains Earth connection to Mains Earth stud on In-
verter PCB
0 VAC
P3
Main Transformer Secondary start tap wrt Secondary
centre tap
80 V peak
P7
Main Transformer Secondary finish tap wrt Secondary
centre tap
80 V peak
P2
Secondary Inductance connection, 6.35mm QC tab, to
Secondary start tap
80 V peak
P9
Secondary Inductance connection, 6.35mm QC tab, to
Secondary finish tap
80 V peak
P4
Main Transformer Primary start tap
340 V peak
P6
Main Transformer Primary finish tap
340 V peak
+ve Output
Positive Welding Terminal Connection
80 VDC ± 15%
-ve Output
Negative Welding Terminal Connection and Main
Transformer Secondary centre tap
0 VDC
Table 12-5 Power Terminal function (connects to various components from the Inverter PCB)
Summary of Contents for WELDSKILL 180
Page 20: ...SERVICE MANUAL 180 INTRODUCTION 2 8 0 5461 This Page Intentionally Blank ...
Page 24: ...SERVICE MANUAL 180 INSTALLATION 3 4 0 5461 This Page Intentionally Blank ...
Page 28: ...SERVICE MANUAL 180 OPERATION 4 4 0 5461 This Page Intentionally Blank ...
Page 54: ...SERVICE MANUAL 180 ROUTINE SERVICE REQUIREMENTS 7 4 0 5461 This Page Intentionally Blank ...
Page 56: ...THEORY OF OPERATION 8 2 0 5461 SERVICE MANUAL 180 This Page Intentionally Blank ...
Page 76: ...KEY SPARE PARTS 13 2 Manual 0 5461 SERVICE MANUAL 180 This Page Intentionally Blank ...
Page 79: ...SERVICE MANUAL 180 This Page Intentionally Blank ...