![Ciena 170-3930-900 Hardware Installation And Start-Up Manual Download Page 7](http://html1.mh-extra.com/html/ciena/170-3930-900/170-3930-900_hardware-installation-and-start-up-manual_2606954007.webp)
vii
3930 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation
January 2014
Contents
0
Required Tools and Supplies 2-2
Important Safety Information 2-3
Mounting the Device 2-4
Wall Mount Installation 2-4
Frame Installation 2-4
Power Supply Grounding 2-5
Supplemental Ground 2-5
Simplex Power 2-6
Redundant Power 2-7
Dressing the Power Cord 2-7
AC Power Supplies 2-7
DC Power Supplies 2-8
Transceivers 2-9
Cable Installation and Guidelines 2-10
Connecting Cables to the 3930 2-11
Alarm Cable 2-12
Synchronization Cable 2-13
GPS/1PPS/TOD Cable 2-14
Fiber Optic Cables 2-14
Ethernet Cables 2-15
To Install 3930 on a Wall 2-16
To Install 3930 in a Frame 2-17
Installing Supplemental Ground 2-18
Installing an AC Power Supply 2-19
Installing a DC Power Supply 2-21
Installing an Alarm Cable (Optional) 2-24
Installing a Sync Cable (Optional) 2-25
Summary of Contents for 170-3930-900
Page 103: ......