
2-2
Installation
3930 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation
January 2014
If the unit is damaged or if any of the above items are missing, please contact
your sales representative.
Note:
Mounting brackets for Wallmount, and 23-inch racks are also
available. If they are required for your installation, you need to order these
brackets separately.
You will also need to order:
•
Power supplies (up to 2 AC or 2 DC power supplies)
•
Power cables
•
Grounding lug and grounding wire
•
Alarm cable
•
SFP/SFP+ modules for the 1/10 Gigabit Ethernet ports (up to 2 ports)
•
SFP modules for the 100/1000 Mbps ports (up to 8 ports)
•
Faceplate cabling (Cat-5 STP and optical cabling to match the SFP and
SFP+ connector types used)
•
SYNC cable — BITS cable available in 100 or 120 Ohm
•
1 PPS cable
•
10 MHz cable
Note:
Ciena offers a coax to SMB cable for connection to the 1 PPS and
10 MHz ports. The same cable can be used for both ports.
Required Tools and Supplies
For rack mount installations you will also require the following tools:
•
Flat head screwdriver
•
Phillips #2 screwdriver
•
Digital Volt Ohm Meter
•
rack screws (4 per device)
•
cable ties / cord retainers — to secure ground, power and interface cabling
•
Wire-strippers (for DC power cable)
•
Fork terminal spade lugs (3 per DC power supply) — to install power
cabling to a DC system
•
Power wire (14 AWG) — to install power cabling to a DC system
provides a summary of the DC lugs that are
recommended for use with the 3930.
Summary of Contents for 170-3930-900
Page 103: ......