
VECTIOS
POWER TM
PJ
EN-18
7 - POSITIONING AND INSTALLATION
7.6 Recommended service clearance
Important: This is the
minimum
space required for maintenance operations and access inside the unit. Depending on the assembly
selected for the unit and the characteristics of the installation site, a larger space around it may be required to ensure proper air
circulation and therefore the correct operation of the unit.
Unit not designed to have overhead obstruction.
C0 and CS assemblies
CW assembly
CP and CR assemblies
CQ and CT assemblies
A
B
C
D
A
B
C
D
IPJ - 0420 to 0720
A
B
C
D
A
B
C
D
IPJ
Overall dimensions
(mm)
Service clearance
(mm)
Length Width Height
A
B
C
D
0420 to 0500
3.820 2.257 2.293 2.200 1.000 1.200 1.000
0560 to 0720
4.224 2.257 2.340 2.400 1.000 1.200 1.000
IPJ
Overall dimensions
(mm)
Service clearance
(mm)
Length Width Height
A
B
C
D
0420 to 0500
3.820 2.257 2.555 2.200 1.000 1.200 1.000
0560 to 0720
4.224 2.257 2.555 2.400 1.000 1.200 1.000
IPJ
Overall dimensions
(mm)
Service clearance
(mm)
Length Width Height
A
B
C
D
0420 to 0500
3.820 3.112
2.255 2.200 1.000 1.200 1.000
0560 to 0720
4.224 3.112
2.555 2.400 1.000 1.200 1.000
IPJ
Overall dimensions
(mm)
Service clearance
(mm)
Length Width Height
A
B
C
D
0420 to 0500
3.825 2.268 2.555 2.200 1.000 1.200 1.000
0560 to 0720
4.229 2.268 2.555 2.400 1.000 1.200 1.000
Summary of Contents for VECTIOS POWER IPJ Series
Page 1: ...NA 20 574 A 10 2020 BROCHURE Instruction manual VECTIOS POWER TM PJ...
Page 2: ......
Page 4: ......
Page 58: ...Notas...
Page 59: ......
Page 60: ......