Remove upper intake manifold (2) fasteners (1)
New engines are received from Chrysler as full assemblies. Upon delivery to the build area, they should be
disassembled and prepared for test. Cylinder heads should be disassembled and the bare heads need to be packaged
for shipment to IMTS for special processing. Packaging from the new cylinder heads to be used for the test should be
used for return of new core materials to IMTS.
Remove the flywheel and disengage the
ignition and fuel injector harness clips on
the upper intake manifold brackets (1).
Remove both upper intake manifold
brackets (2).
Remove PCV vacuum tube from rocker cover to
upper intake manifold.
1
Revision DRAFT
Mar‐16
New Engine Disassembly
Section
Sheet
3
Summary of Contents for IIIH
Page 9: ...Section 3 New Engine Disassembly...
Page 20: ...Section 4 Main Oil Gallery Modifications and Honing...
Page 34: ...Section 5 Post Honing and Special Parts Cleaning...
Page 42: ...Section 6 Cylinder Head Pre Build Cleaning and Assembly...
Page 46: ...Section 7 Short Block Assembly and General Information...
Page 60: ...Section 8 Long Block Assembly...
Page 75: ...Section 9 Final Dress...
Page 89: ...Section 10 OHT Hardware...
Page 93: ...OHT3H 304 2 Pan Oil Modified Revision DRAFT OH Technologies Section 10 Mar 16 Sheet 4...