Programmable AC/DC Electronic Load 63800 Series Operation & Programming Manual
10-10
10.5.6 V_Monitor, Voltage Measurement Verification
1. Press
CC
to enter CC mode.
2. Use high voltage DC Source, the settings are as
3. Switch DVM2 measurement terminal to Front, it is for measuring V_Mon voltage.
4. Please confirm if the values of Meter, Load & DVM meet to that in
Table 10-13
Source
Meter & Load
Measurement
V_Mon
Voltage (V)
V Specification
Specification
10V
9.49~10.51
0.179~0.221
500V
499~501
9.93~10.07