3-24
Solaria One/Solaria One
+
Service Manual
020-101039-02 Rev. 1 (06-2013)
Section 3: Parts and Module Replacement
3.29
Remove the AC Line Filters
The AC line filters and A/C selector switch are located at the rear-left corner of the projector.
• The 110V filter is for the optional UPS hookup. Use the UPS to keep the projector’s electronics powered ON
in the event of a power loss so that the lamp can be struck as soon as full power is reapplied without having
to wait for the electronics to restart.
• The 220V filter is required to power the LPS and strike the lamp.
• The A/C selector switch is used to select between the 110V and 220V power source.
3.29.1
110V AC Line Filter
1. Turn the lamp off and cool the projector for at least 15 minutes.
2. Turn the projector off and then disconnect it from AC power.
3. Remove the lamp. See
Remove the Existing Lamp on page 3-10
4. Remove the side and rear projector skins. See
Remove the Exhaust Panel Skin on page 3-9
5. Remove the 2 screws that secure the AC line filter to the bracket.
6. Disconnect the 2 harnesses from the 110V AC line filter.
3.29.2
220V AC Line Filter
1. Turn the lamp off and cool the projector for at least 15 minutes.
2. Turn the projector off and then disconnect it from AC power.
3. Remove the lamp. See
Remove the Existing Lamp on page 3-10
A
A/C Selector Switch
B
110V Filter
C
220V Filter
A
B
C
Summary of Contents for Solaria One
Page 1: ...Solaria One Solaria One S e r v i c e M a n u a l 020 101039 02 ...
Page 2: ......
Page 3: ...Solaria One Solaria One S e r v i c e M a n u a l 020 101039 02 ...
Page 8: ......
Page 28: ......
Page 70: ......
Page 76: ......
Page 80: ......
Page 87: ......