Installation
12
ONEAC Sinergy SE II Series UPS User Manual
Cable Sizes and
Current
The following table indicates the recommended sizes of conductors in accordance with the NEC
®
. (Air
temperature surrounding the conduits not greater than 104°F (40°C).)
NOTE: Cable sizes are suggested and based on standard configurations. Installers should verify correct
conductor sizes pursuant to NEC
®
and/or state or local codes. If the installation requires long conductor
runs, consult NEC
®
and/or state or local codes to account for electrical losses.
Table 4. Cable Sizes
Term ID
Description
6 kVA (4 kVA)
10 kVA (8 kVA)
main wire
gauge
(awg
term
torque
(in-lbs)
min wire
temp
(°C)
*
main wire
gauge
(awg
term
torque
(in-lbs)
min wire
temp (°C)*
JMP
JL1
Line 1 (Jumper)
‡
8
22
90
6
22
90
JL2
Line 2 (Jumper)
‡
8
22
90
6
22
90
MAIN
ML1
Line 1 (Main)
8
22
90
6
22
90
ML2
Line 2 (Main)
8
22
90
6
22
90
E/G
Chassis Ground
**
22
90
**
22
90
BYPASS
BL1
Line 1 (Bypass)
8
22
90
6
22
90
BL2
Line 2 (Bypass)
8
22
90
6
22
90
E/G
Chassis Ground
**
22
90
**
22
90
OUTPUT
‡‡
X1
Output Term 1
10
22
90
6
22
90
X2
Output Term 2
10
22
90
6
22
90
X3
Output Term 3
10
22
90
6
22
90
E/G
Chassis Ground
10
22
90
6
22
90
X4
Output Term 4
10
22
90
6
22
90
X5
Output Term 5
10
22
90
6
22
90
X6
Output Term 6
10
22
90
6
22
90
‡ Wire between JL1 & BL1 and between JL2 & BL2 if only single input power source is used.
‡‡ Output voltage available at output terminals dependent on specific model. See Table 5 - 7 on page 13 for details.
* Use insulated copper wire rated 90°C minimum
** Must be no smaller than wire connected to L1 and L2
NOTE: For installation per IEC regulations: If installing units per regulations IEC-287 and DIN VDE 0298, 6 kVA model
should be wired (inputs and outputs) with 6 mm
2
cable torqued to 2.5 nt-m; and 10kVA model (inputs and outputs) should be
wired with 10 mm
2
cable torqued to 2.5 nt-m. (Based on 90°C cable and ambient of 40°C)