KAHUNA
Users Manual
6
Installation Test
Test the Lift operation by doing the following (requires a vehicle on the lift):
1.
Push “up” switch to a position where the vehicle is just leaving the ground.
2.
Raise lift only HALF WAY then lower completely at least one dozen times.
3.
Raise lift to its extreme position and inspect. Make sure that there are no hydraulic
leaks. Test mechanical locks. Make sure that the lift holds vehicle in steady position
without lowering.
4.
Raise lift slightly and push lock release button. Check that lift lowers smoothly and at a
safe speed.
5.
Repeat above procedures to make sure that lift is operating normally.
NOTE:
During the initial testing, the lift will descend slowly. This is normal. It helps to add a
payload, no greater than 500 pounds to help speed up the decent during this process.
6.
Check all hoses for leaks. Tighten if necessary.
Summary of Contents for Kahuna
Page 1: ...OWNERS MANUAL KAHUNA 2009 Chief Automotive Technologies USERS MANUAL ...
Page 2: ......
Page 6: ...KAHUNA Users Manual 4 GENERAL SPECIFICATIONS ...
Page 11: ...KAHUNA Users Manual 9 Controls ...
Page 30: ......
Page 31: ......