Maintenance
6.1 Preventive maintenance schedule
Warning
Before carrying out any maintenance, repair work or adjustment,
proceed as follows:
• Stop the compressor.
• Press emergency stop button (S2).
• Close the air outlet valve and open the manual condensate drain valves.
• Switch off the voltage.
• Open and lock the isolating switch.
The operator must apply all relevant
Warranty - Product Liability
Use only authorized parts. Any damage or malfunction caused by the use of unauthorized parts
is not covered by Warranty or Product Liability.
General
When servicing, replace all removed gaskets, O-rings and washers.
Preventive maintenance schedule
The maintenance schedule is prior to the maintenance warnings displayed
on the controller.
It is the responsibility of the owner to carry out the required maintenance at
the appropriate moment.
Period
Running hours Operation
Daily
8
Check readings on display.
Daily
8
Check that condensate is discharged during loading.
Daily
8
Check oil level. Before starting, the level should be in the middle of
the sight-glass.
Weekly
--
Drain condensate from the air receiver, if installed
3-Monthly
--
Clean compressor.
3-Monthly
--
Check for possible leaks.
3-Monthly
500
Check the coolers; clean them if necessary. See the section
Coolers
.
3-Monthly
--
Remove air filter elements and inspect
Yearly
--
Have safety valve tested
Yearly
--
Have all flexibles inspected
2-Yearly
8000
If Roto-Xtend Duty Fluid is used, change oil
2-Yearly
8000
Replace oil filters
2-Yearly
8000
Replace air filters