(4) Manually adjust injection initial point position method
Note: Plasticizing cylinder temperature must reach the setting temperature.
Injection presetting position: GG = 0.5mm.
Press
INJ
射胶
key, injection touched the bottom, and the actual injection position is
automatically changed to preset position with setting value of 0.5mm, and the
manual injection initial point setting is completed.
(5) Manually adjust ejector initial point position method
Note
:
mould opening position must reach the termination position. Presetting
of ejector is FF = 0.5mm, press
退针
EJECT BW D
key, and ejector retraction is back to the
end, the actual ejection position is automatically changed to preset
position with setting value of 0.1mm.Function of initial position is to
automatically reset the decoder position. Initial point position refers to
the reset sensor position, and reset the initial point by means of this
sensor position.
(6) Setting method of mould clamping initial point position:
Initial point position of mould clamping refers to the reset sensor position
of mould clamping, during mould opening and reset sensor being triggered, the
initial point position of mould clamping will be reset.
(i)
Adjust mould thickness to enable the mould fixed on primary board and
secondary board will not contact each other, after the toggle of mould
clamping has completely straightened. If no mould is on the mould plate,
this step can be passed over.
(ii)
In the initialization setting interface(61),and in the mould clamping initial
point position HHp, input a larger value. (e.g.2000p)
(iii)
n mould clamping interface (06), position of high pressure mould clamping
will be changed to 0p.
(iv) Manual status, it is required for mould clamping and opening for three times
respectively. Each time of manually mould clamping, toggle is required to
completely straighten, each time of mould opening, the reset sensor will
be triggered.
(v)
After mould clamping for three times, while toggle completely straightening,
record the actual position of mould clamping (e.g. 1250p).
(vi)
New initial point position of mould clamping (the position of reset sensor is
triggered) HH = 2000p - 1250p = 750p.
(vii)
In the initial point position GG of mould clamping, input new value 750p.
(viii)
Perform mold opening and clamping for three times, if each actual
position of mould clamping below is ones place, setting of initial point
position (position of mould clamping reset sensor) of mould clamping is
completed.
If the value of actual mould clamping termination position is tens digit or
above,it is required to repeat the steps (v)-(viii)items.
(ix)
In mould clamping interface (06), and input 100p the position of high
pressure mould clamping.
(
7
)
Setting method of ejection initial point position:
Initial point position of injection is the reset sensor position of injection.
During plasticizing and reset sensor being triggered, the initial point position of
injection will be reset.
Summary of Contents for Ai-02
Page 7: ...Ai 02 Operation Manual 4 Introduction on each Part of Computer s Panel 4 1 Computer s Panel 7...
Page 49: ...Time monitor interface 30...
Page 59: ...5 33 Help Help interface 40 Help interface 41 Help interface 42...
Page 110: ...6 4 Ai 02 circuit diagram 6 4 1 Ai 02 Input Connection Encoder Version...
Page 113: ...6 4 4 Ai 02 Motor Power Control Circuit SVP...
Page 115: ...6 4 6 Ai 02 Input Point Connection Diagram of Computer I O Board...
Page 116: ...6 4 7 Ai 02 Output Point Connection Diagram of Computer I O Board...
Page 117: ...6 4 8 Ai 02 extension I O board Connection Diagram...
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......