41
The operator manoeuvring the lifting equipment is responsible for
lifting the load.
Leave a free space of at least 20 cm between the equipment and the
walls of the room and/or other equipment to facilitate machine use,
cleaning and maintenance operations.
Be careful that children do not play with the packaging
materials (for example, plastic film and polystyrene).
Suffocation danger!
4 PREPARATION OF THE INSTALLATION
AREA
Responsibility for operations executed in the location where
the machine is installed is, and remains, of the user. The user is also
responsible for execution of controls related to the installation of the
machine.
The user must comply with all local, national and European safety
regulations.
The equipment must be installed on surfaces with adequate load
capacity.
The assembly and disassembly instructions for the equipment are
reserved for specialized technicians.
It is always recommended that users contact our assistance service
for requesting qualified technicians.
If other technicians intervene, it is recommended to make certain of
their skills.
Prior to starting machine assembly or disassembly, the installer must
respect safety precautions in compliance with the law, and in
particular must:
A)
not operate in unfavourable conditions;
B)
operate in perfect psycho-physical conditions and check
that the individual accident prevention devices work
perfectly;
C)
wear safety gloves;
D)
wear safety footwear;
E)
make sure that the area used for assembly and
disassembly is free of any obstacles.
Summary of Contents for CHAR3
Page 2: ...2...
Page 3: ...3 ITALIANO...
Page 18: ...18 FRAN AIS...
Page 33: ...33 ENGLISH...
Page 45: ...45 Spiral pin maintenance...
Page 48: ...48...
Page 50: ...50 1 1 1 1 2 1 3...
Page 51: ...51 1 4 1 5 1 6...
Page 53: ...53 1999 44 CE 1 9 1 10...
Page 54: ...54 1 11 1 12 1 13 1 14 2 2 1...
Page 55: ...55 2 2 2 3 3...
Page 56: ...56 20 4 A B C D E...
Page 57: ...57 5 5 1...
Page 58: ...58 5 2 A B C D 5 3 6 1 A B C D...
Page 59: ...59 0 6 D 6 6 1 6 2...
Page 60: ...60...
Page 61: ...61 7 8...
Page 62: ...62 13 25 2005 n 151 2002 95 CE 2002 96 CE 2003 108 CE...
Page 63: ...63 ESPA OL...
Page 75: ...75 Mantenimiento del pasador de la barrena...
Page 78: ...78 DEUTSCH...
Page 90: ...90 Wartung der Schnecken...
Page 92: ...92 WIRING DIAGRAM...
Page 93: ...93 EXPLODED VIEW...