Removing   and   Installing   the   Top   Panel   

Removing   the   Top   Panel:   

1.

 

Remove   two   (2)   shipping   brackets   on   top   of   cabinet   using   13mm   socket   wrench.   

2.

 

Open   the   rear   door(s)   of   the   cabinet.   Remove   grounding   wire   from   the   top   panel   (item   1   in   image   

next   page).   

3.

 

Depress   and   hold   the   two   (2)   spring   retainers   (item   2   in   image   next   page)   that   hold   the   top   panel   to   

the   frame.   

   

4.

 

Push   up   on   the   top   panel   and   remove.   

Installing   the   Top   Panel:   

1.

 

Align   the   front   edge   of   the   top   panel   with   the   frame.   

2.

 

Lower   the   top   panel,   sliding   it   forward   to   make   contact   with   the   front   of   the   frame.   

   

3.

 

Lower   the   back   of   the   top   panel.      Insure   that   the   two   (2)   spring   retainers   have   snapped   in   place   and   

secure   the   top   panel   from   lifting.   

4.

 

Reconnect   top   panel   ground   wire.   

Summary of Contents for GlobalFrame GF Series

Page 1: ...Grip Seismic Frame SlimFrame TeraFrame GlobalFrame Cube iT Plus Evolution OnTrac QuadraRack and Velocity are federally registered trademarks of Chatsworth Products Inc eConnect and Simply Efficient are trademarks of Chatsworth Products Inc All other trademarks belong to their respective companies Rev 4 08 14 MKT 60020 578 techsupport chatsworth com www chatsworth com ...

Page 2: ... cabinet to the floor 11 Bonding the cabinet to the telecommunications ground 12 Configuring the cabinet 14 Removing and Installing the Front Door 14 Removing and Installing the Rear Doors 16 Removing and Installing the Top Panel 17 Removing and Installing the Side Panels 18 Adjusting the Equipment Rails 21 Installing the Standard PDU Brackets 21 Installing Equipment 22 Cable Management 22 Accesso...

Page 3: ...s may result in equipment damage personal injury or death Read and understand all instructions for proper installation and use of this product Only trained service personnel or licensed electricians shall install the equipment Be sure to use sufficient personnel to safely remove the cabinet from the pallet Do not attempt to move large cabinets by yourself Obtain adequate assistance to stabilize th...

Page 4: ... monitor tie down kit P N 11725 701 seismic equipment tie down bracket P N 14061 719 or equipment tie down bracket P N 16356 719 The cabinet can support many system configurations The amount of force required to tip or make the cabinet unstable differs with each Read and follow your equipment manufacturer s specific assembly installation and safety instructions When servicing slide mounted equipme...

Page 5: ...ncluding servers and peripherals Allow only qualified service personnel to use the cabinet The cabinets must be anchored to the floor to ensure stability and a safe working environment The GF Series GlobalFrame Gen 2 Cabinet is available with a 4 slide or 6 slide frame The 4 slide frame has two front to back supports on each side The 6 slide frame has three front to back supports on each side 6 sl...

Page 6: ...ide shown 4 Slide available 6 Side panel 6 Slide shown 4 Slide available 2 Front door 7 Double rear door 3 Equipment mounting rails 8 Single solid rear door 4 Standard top panel 9 Bottom Panel included with duct 5 Vertical Exhaust Duct top panel 10 Standard PDU bracket ...

Page 7: ...cluded Hardware 1 2 Keys 2 50 M6 Cage Nuts and Screws 3 2 Standard PDU Brackets 4 M6x16 Screw and Front Mount Nut 4 2 Baying Brackets 4 M8x16 Hex Head Screws 4 M8 Hex Nuts x 2 x 50 x 50 x 2 x 4 x 2 x 4 x 4 ...

Page 8: ...ompound 6 4 Anchor Brackets 4 M8x20 Hex Head Screws Used to secure the cabinet to the pallet during shipping and to the floor at the jobsite 7 1 Shipping Bracket Used for shipping only under the front door to help support and secure the door x 1 x 2 x 2 x 4 x 4 x 4 x 1 ...

Page 9: ...For removing and installing door hinges c For installation and removal of PDU brackets 6 5mm Ball Hex Driver with 12 L 300 mm shaft CPI P N 39150 001 ordered separately a For adjusting leveling feet Unpacking CAUTION The GlobalFrame cabinet is heavy Use a minimum of two 2 people to unpack and remove the cabinet from the pallet CAUTION The GlobalFrame casters are for moving the cabinet short distan...

Page 10: ... cabinet from the pallet For Shock Pallet Cabinets P N GF XXXX3 XB that are loaded with equipment use the Ramp Kit P N 39207 701 ordered separately to roll the cabinet off the pallet RECYCLABLE MATERIALS CPI uses only recyclable materials in all of its cabinet packaging Please save packaging for later use or dispose of properly All wood components of CPI pallets have been properly treated to compl...

Page 11: ... the cabinet should not rock in any direction A level placed on the cabinet frame should confirm that the cabinet is level If the cabinet is not level adjust the leveling feet with a 12 300 mm long 5mm hex ball driver CPI P N 39150 001 ordered separately or 13 mm open end wrench until the cabinet is level and the cabinet will not rock in any direction GF Series GlobalFrame Gen 2 Cabinets whether b...

Page 12: ...round The top panel side panels doors and mounting rails on the GlobalFrame cabinet are electrically bonded to the frame A ground strap bonds the panels and doors to the frame In order to bond the cabinet to the telecommunications ground use the Ground Terminal Block included to connect a bonding conductor to the telecommunications ground or signal reference grid Remove the mask sticker at desired...

Page 13: ...n the hardware kit to the first cabinet Make sure to use the correct set of holes for the desired cabinet spacing 24 or 600 mm The 24 spacing will center two 600 mm wide cabinets over a 24 access floor tile spaces cabinets approximately 0 4 10 mm apart The 600 mm spacing will bay any two cabinets side by side 3 Move the second cabinet so that the cabinets are aligned This may also require adjustin...

Page 14: ...Front Door 1 Open the front door to 90 degrees so that it is perpendicular to the cabinet The door is perpendicular to the cabinet when it is parallel with the side of the cabinet 2 Disconnect the ground wire 3 While supporting the door retract the hinge pin from the upper hinge Note the door hinge pin and or hinge may be damaged if the door is not properly supported while being removed Hold the d...

Page 15: ... barrel Insert the lower hinge pin into the lower hinge barrel Continue to support the door keeping it vertical and perpendicular to the cabinet frame The door must be supported to prevent damage to the hinges 3 While supporting the door retract the upper hinge pin and then align and release the pin into the upper hinge barrel Check that both hinge pins are inserted into the hinge barrels before r...

Page 16: ... Disconnect the ground wire 4 Open the door to exactly 90 degrees and pull the door away from the cabinet frame Installing the Rear Doors 1 Hold the door in a 90 degree open position 2 Align the hinges on the door with the hinges on the frame and slide the hinges together 3 Rotate the door to the closed position 4 Insert the hinge pins from the top of the hinge into both the upper and lower door h...

Page 17: ...ld the two 2 spring retainers item 2 in image next page that hold the top panel to the frame 4 Push up on the top panel and remove Installing the Top Panel 1 Align the front edge of the top panel with the frame 2 Lower the top panel sliding it forward to make contact with the front of the frame 3 Lower the back of the top panel Insure that the two 2 spring retainers have snapped in place and secur...

Page 18: ... from the cabinet Installing the Side Panels on 6 Slide Cabinet 1 Align the side panel with the cabinet frame and slip the side panel into the side of the frame Allow the side panel to move downwards so that the tabs on the bottom of the panel engage the front to rear frame member below the side panel 2 Connect the ground wire 3 Rotate the side panel up to meet the frame and push until the side pa...

Page 19: ... panel and remove it from the cabinet 5 Lift up on the bottom side panel and remove it from the cabinet 6 Disconnect the ground wire from the bottom side panel Installing the Side Panels on 4 Slide Cabinet 1 Align the bottom side panel with the cabinet frame and slip the side panel into the side of the frame 2 Connect the ground wire 3 Rotate the side panel up to meet the frame and slightly lift t...

Page 20: ...e frame 5 Connect the ground wire 6 Rotate the top side panel up to meet the frame and slightly lift to engage the upper half of the two side panel catches on both ends of the frame The latch engages the front to rear frame member above the side panel 7 Lock the side panel with the key if necessary ...

Page 21: ... two 2 locations on 4 Slide cabinet Markings are provided on the frame to help align the equipment rails so that they are vertical as well as in the same location as the rails on the opposite side of the frame Installing the Standard PDU Brackets 1 Choose the desired corner of the cabinet to install the PDU Brackets and install cage nuts in square holes 2 Position PDU bracket against vertical fram...

Page 22: ... See Adjusting the Equipment Rails on page 18 The GF Series GlobalFrame Gen2 Cabinet is provided with hardware to secure equipment to the mounting rails This hardware includes 50 sets of M6 cage nuts and screws Additional hardware is available for purchase see Other Accessories on page 26 Cable Management CPI cable management products provide the proper cable bend radii for better data transmissio...

Page 23: ...U x 750 39235 X39 Finger Cable Manager Short with Cover 42U x 800 39235 X22 For 31 5 800 mm wide cabinets 45U x 800 39235 X25 Fingers Attaches to equipment rail 48U x 800 39235 X28 52U x 800 39235 X32 Finger Cable Manager with Cover 42U x 700 39112 X11 For 27 6 700 mm wide cabinets 45U x 700 39112 X14 Fingers Attaches to equipment rail 48U x 700 39112 X16 52U x 700 39112 X21 Finger Cable Manager w...

Page 24: ...r 6 Slide Cabinet 42U x 700 39088 X00 For 27 6 700 mm wide cabinets 45U x 700 39088 X03 And 29 5 750 mm wide cabinets 48U x 700 39088 X06 Two 2 half height sections 52U x 700 39088 X10 Ring Cable Manager 6 Slide Cabinet 42U x 800 39089 X00 For 31 5 800 mm wide cabinets 45U x 800 39089 X03 Two 2 half height sections 48U x 800 39089 X06 52U x 800 39089 X10 Cable Lashing Bracket 4 Slide Cabinet 42U 3...

Page 25: ... x 700 39128 X03 One 1 full height section 48U x 700 39128 X06 52U x 700 39128 X10 Ring Cable Manager 4 Slide Cabinet 42U x 800 39129 X00 For 31 5 800 mm wide cabinets 45U x 800 39129 X03 One 1 full height section 48U x 800 39129 X06 52U x 800 39129 X10 Cable Port Brush Kit Brushes for two 2 large cable knock outs 25190 001 in cabinet top panel Front to Back Cable Manager For 27 6 700 mm 31 5 800 ...

Page 26: ...ched versions Standard PDU Brackets 39110 701 Two 2 brackets Attaches to the cabinet vertical frame member Full Height PDU Bracket Dual 4 8 121 mm Two sizes Dual and Wide 42U 39086 X00 Attaches to the cabinet frame 45U 39086 X03 Dual support 2 x 2 2 W 51 mm PDUs 48U 39086 X06 Wide support 2 x 2 7 W 69 mm PDUs 52U 39086 X10 Wide 5 8 147 mm 42U 39221 X00 45U 39221 X03 48U 39221 X06 52U 39221 X10 X C...

Page 27: ...0 39190 X16 Includes top panel exhaust duct 700 x 1050 39190 X27 and bottom panel 700 x 1100 39190 X29 20 34 H 508 863 mm 700 x 1200 39190 X33 750 x 1050 39190 X61 750 x 1100 39190 X63 750 x 1200 39190 X67 800 x 1050 39190 X44 800 x 1100 39190 X46 800 x 1200 39190 X50 600 x1050 39192 X10 600 x 1100 39192 X12 Vertical Exhaust Duct Kit 600 x 1200 39192 X16 Includes top panel exhaust duct 700 x 1050 ...

Page 28: ...x 800 39037 XDL 52U x 1000 39037 XDW 52U x 1050 39037 XEA 52U x 1100 39037 XEC 52U x 1200 39037 XEG 42U x 800 39033 X00 42U x 1000 39033 X08 42U x 1050 39033 X10 42U x 1100 39033 X12 Side Panel with Grommet Sealed 42U x 1200 39033 X16 Cable Openings 4 Slide Cabinet 45U x 800 39033 X51 Pair of panels 45U x 1000 39033 X59 for one side of cabinet 45U x 1050 39033 X61 Includes one 1 key 45U x 1100 390...

Page 29: ... 800 39085 X22 45U x 800 39085 X25 48U x 800 39085 X28 52U x 800 39085 X32 Air Dam 4 Slide Cabinet 42U x 600 39130 X00 For 23 6 600 mm 27 6 700 mm 45U x 600 39130 X03 and 31 5 800 mm wide cabinets 48U x 600 39130 X06 Use with Bottom Panel p 28 and 52U x 600 39130 X10 Snap In Filler Panel p 29 42U x 700 39130 X11 45U x 700 39130 X14 48U x 700 39130 X17 52U x 700 39130 X21 42U x 800 39130 X22 45U x ...

Page 30: ...de cabinets Set of 8 grommets that push into equipment rails Snap In Filler Panel 1U X19 Black 6 EA 34537 001 2U X19 Black 6 EA 34538 001 1U X19 Black 50 EA 34537 002 2U X19 Black 50 EA 34538 002 1U X19 Glacier White 6 EA 34537 E01 2U X19 Glacier White 6 EA 34538 E01 1U X19 Glacier White 50 EA 34537 E02 2U X19 Glacier White 50 EA 34538 E02 X Color C Black E Glacier White Shelves Trays and other ac...

Reviews: