FOR THE HEIGHT, WIDTH, & DEPTH OF YOUR CPU. MAKE SURE THE CPU HAS
PAGE 1 OF 3
ENOUGH CLEARANCE TO ROTATE LEFT & RIGHT AS FAR AS YOU WANT IT TO
1
VERSION DATED: 8/15/11
ROTATE.
STEP 2:
REMOVE THE CPU HOLDER FROM THE TRACK
SQUARE
2
TAPE MEASURE
#2 SQUARE HEAD DRIVER BIT
#2 PHILLIPS DRIVER BIT OR
CORDLESS DRILL
TOOLS REQUIRED FOR ASSEMBLY:
READ ALL THE INSTRUCTIONS BEFORE BEGINNING
BY SLIDING IT OUT
TOWARD THE FRONT AND SET IT ASIDE.
STEP 3:
HARDWARE PACK # 50519
EXPOSE THE GLUE DOTS ON THE TOP OF THE TRACK
1
BY PULLING
THE PAPER STRIPS OFF THE TRACK. POSITION THE TRACK IN THE LOCATION
SHOWN AND PRESS IT FIRMLY IN PLACE SO THE GLUE DOTS WILL HOLD THE
TRACK TO THE BOTTOM OF THE WORKSURFACE.
IMPORTANT NOTE: THE WORKSURFACE MATERIAL MUST BE COMPATIBLE WITH
THE SCREWS PROVIDED. THE WORKSURFACE MUST BE AT LEAST 1" THICK.
INSTRUCTION # 50576
STEP 4:
ATTACH THE TRACK
1
. DO NOT OVER-TIGHTEN THE SCREWS. USE A LOW TORQUE
TO THE WORKSURFACE WITH (4) WOOD
SCREWS
SETTING ON THE DRILL.
200CPU HOLDER INSTALLATION INSTRUCTIONS:
STEP 1:
DETERMINE THE LOCATION TO MOUNT THE CPU HOLDER ALLOWING
ITEM # PART #
DESCRIPTION
QTY.
1
50093 16" TRACK ASSY
1
2
51708 M5 x 18mm SQ/PH/WSHR HEAD WOOD SCREW
4
3
200CPU ECONOMY CPU HOLDER
1
4
52679 8-32 x 3/8 PHILLIPS TRUSS HEAD MACHINE SCREW
2
5
50330 #20/3 WIRE PULL HANDLE
1
6
50232 FRONT STOP
1
7
50200 10-24 x 1/2 SELF TAPPING MACHINE SCREW
2
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
K&A MANUFACTURING
1
PAPER STRIPS
COVERING
GLUE DOTS
STEP 3
WORKSURFACE AND BACK 3/8"
WITH THE FRONT OF THE
1
2
PLACE THE TRACK SQUARE
BOTTOM OF WORKSURFACE
STEP 4