The build process continued -
Steps 61 to 72 are for Fastlane installation only
STEP 71
Replace grill and attach the top to complete.closed position.
STEP 72
Attach the hose ends to the hydrolic pump (hose ends are
colour coded). Refer to the Fastlane manual for the start up
procedure.
STEP 73
Go around the pool gently tightening the nuts and checking
that the pool timbers are level.
Do not over tighten.
STEP 74
While the pool is filling with water, place the timber top
surround into position around the pool.
STEP 75
Line up all 8 corners with an even overlap of the timber. Make
use of the clamps to help hold the timbers into position. Using
straps as per step 31, will also make this process easier.
STEP 76
When all of the top timbers are in position start by drilling a
6mm pilot hole into the timber underneath.