STEP 24
Repeat on other 3 sides with half timber tops.
The build process continued
STEP 25
Place the upright posts in the steel shoes with the holes facing
outwards. Do not fix the uprights in the shoes.
STEP 26
Align the upright posts with the wall holes.
DO NOT fix the upright posts to the steel base shoes (only fix
at the top) as it is important that the pool timbers are allowed
to dry and settle into the shoes.
STEP 27
Loosely attach the 96mm x 96mm timbers to the long bolts
protruding through the posts. Do not tighten fully at this stage.
STEP 28
Use a clamp to hold the timbers in position when drilling and
fixing.
STEP 29
Drill holes through the timber and pool wall and insert a
230mm x 12mm bolt through from the inside as shown.
Please note:
It is very important to level each corner before drilling.