STEP 36
The steel ring beam should lay tightly inside the timber ring
beam all the way around the pool.
The build process continued
STEP 37
Screw the metal ring beam to the wooden ring beam using
No12 x 2.5 screws SPGP38 and washers SPGP39.
STEP 38
Check that all the posts are upright. Tap the base
left or right as neccessary using the mallet.
STEP 39
Fix steel shoe to the base with 10mm coach screws and fit the
plastic cap. Do not fix the post to the base shoe.
STEP 40
Hold the skimmer support timber under the skimmer. Using
the 100mm coach screws and washers, tighten with the socket
wrench so that the timber supports the skimmer.
Please note:
Pre drill the hole 6mm before fitting bolt if preferred.