CMW
070517
Page 16 | 1-855-235-5271
EVAPORATOR UNIT PREPARATION
5.
Unscrew the sixteen (16) screws and remove the top
access panel.
6.
Remove the knockout(s) that you will be using to route
the line set, power wires, display cable, bottle probe,
and drain line.
7.
Locate the white zip tie securing the drain line tube to
the suction line and cut it. Direct the end of the drain
line away from refrigerant lines.
1. Power cable
2. Controller & bottle
probe wiring
8.
Pull tubing out of housing to allow room for brazing.
Make sure tubing protrudes out of the housing and
the drain line is moved out of the way as shown.
NOTE:
If installing the unit with attic access, perform steps
5-8 after the unit has been mounted.
CUT THIS ZIP TIE
DO NOT CUT