
42
Calibration
1.
Power On, the screen will display “boot” and then “loading.”
2.
From start screen, press and hold the
key until,
The screen will display:
3.
Enter the passcode “2580”.
4.
Press
key to enter the passcode.
The screen will display “
busy
”
and then will go into calibration mode.
5.
Press
to go to
calibration
menu. “Scale 1” will be displayed.
6.
Press
to go to
Scale 1
menu.
Summary of Contents for 510
Page 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Page 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Page 15: ...15 Chapter 2 INSTALLATION ...
Page 19: ...19 Chapter 3 LOAD CELL WIRING ...
Page 25: ...25 Chapter 4 Component Description ...
Page 27: ...27 Chapter5 Optional Equipment ...
Page 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Page 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Page 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Page 44: ...44 CHAPTER 9 MAINTENANCE ...
Page 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Page 50: ...50 ILLUSTRATED PARTS PAGES ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 SCHEMATICS AND DRAWINGS ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...