
21
Table 1: Connector Wiring
WIRING DESIGNATION
WIRE COLOR
(+) Excitation Red
Red
(-) Excitation
Black
(+) Signal
Green
(-) Signal
White
(+) Sense
Blue
(-) Sense
Brown
Ground or Shield
Clear
CALIBRATION INSTRUCTIONS
1. Calibrate the scale to indicator per instructions supplied with your indicator.
2. After calibration has been completed, take a known weight (ideally 25% of capacity) and check
each corner. Place weight between center of scale and each corner one at a time as shown in
Figure 2: Junction Box Connections
. Use the same calibrated weight in each corner.
3. If the indicator weight reading deviates from the known weight the junction box trim pot for that
corner should be adjusted. A qualified Scale Technician should perform this procedure. Call your
GSE Distributor for service.
4. To adjust the corner weight readings, use the trim pot designated for that corner which is numbered
the same as the corner you need to adjust. Turning the pot clockwise increases the weight reading.
Refer to
Figure 1: Load Cell Configuration
for the correct location.
5. After each corner has been checked and calibrated, make a final check of your calibration in all
corners and center of the scale.
6. The scale is now calibrated and ready for use.
LOAD CELL REPLACEMENT
Should a load cell become damaged due to an overload condition, replacement load cells can be
ordered from GSE Scale Systems according to the part numbers?
1. Unbolt the defective load cell, and then remove leveling load foot from the load cell.
2. Disconnect load cell cable from junction box and attach a chase wire to the load cell cable.
Summary of Contents for 510
Page 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Page 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Page 15: ...15 Chapter 2 INSTALLATION ...
Page 19: ...19 Chapter 3 LOAD CELL WIRING ...
Page 25: ...25 Chapter 4 Component Description ...
Page 27: ...27 Chapter5 Optional Equipment ...
Page 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Page 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Page 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Page 44: ...44 CHAPTER 9 MAINTENANCE ...
Page 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Page 50: ...50 ILLUSTRATED PARTS PAGES ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 SCHEMATICS AND DRAWINGS ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...