
14
Connect high-pressure airline to filter regulator, located on
back side of packer. A suitable source of supply is a
(1/2”
pipe connection).
It is recommended that an extra water trap (not supplied
with machine) be installed prior to the regulator in the high-
pressure airline and the packer. Drain trap as required.
Connect air hoses to cylinder of bag chair for automatic bag
discharge (optional equipment). If the machine was
ordered from the factory with options, this will already be
done. If the machine was not originally ordered with an
option, the manifold should be pre-plumbed for one option
at a later time.
Connect all air hoses which were disconnected for
shipment. All hoses and related fittings are correspondingly
color coded for ease of re-assembly.
Summary of Contents for 510
Page 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Page 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Page 15: ...15 Chapter 2 INSTALLATION ...
Page 19: ...19 Chapter 3 LOAD CELL WIRING ...
Page 25: ...25 Chapter 4 Component Description ...
Page 27: ...27 Chapter5 Optional Equipment ...
Page 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Page 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Page 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Page 44: ...44 CHAPTER 9 MAINTENANCE ...
Page 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Page 50: ...50 ILLUSTRATED PARTS PAGES ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 SCHEMATICS AND DRAWINGS ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...