
4
CHAPTER 7
PLC and Timers Adjustments
……………………………………………….
36
Controller
Name of Levels and Timers
Adjusting the Timers
CHAPTER 8
Weigh Controller and Adjustments
………………………………………… 40
CHAPTER 9
Maintenance
…………………………………………………………………….
44
CH
APTER 10
Trouble Shooting
…………………………………………………………….
46
Controller doesn’t return to Zero
Erratic weighs
Digital readout does not match the floor scale
Controller does not lite up
Dirty filling
Illustrated Parts sheets
……………………………..………………………………………
50
Schematics /Layouts
…………………………………………………………………….……
56
Summary of Contents for 510
Page 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Page 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Page 15: ...15 Chapter 2 INSTALLATION ...
Page 19: ...19 Chapter 3 LOAD CELL WIRING ...
Page 25: ...25 Chapter 4 Component Description ...
Page 27: ...27 Chapter5 Optional Equipment ...
Page 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Page 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Page 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Page 44: ...44 CHAPTER 9 MAINTENANCE ...
Page 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Page 50: ...50 ILLUSTRATED PARTS PAGES ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 SCHEMATICS AND DRAWINGS ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...