37
PLC
PLC means Programmable Logical Controller. Our PLC is programmed
with specific programs to work with our equipment. Our programs are set
up for Valve filling, O/M net weigh and gross weighing equipment.
In the PLC, there are timers going to specific functions on the various types
of equipment which we factory set but need to be fined tuned in the field.
Below we discuss how to adjust the timers when you go to fine tuning
them.
Timer Adjustment Procedure for PLC
A
Button is used to scroll through the Timers
B
Button is used to scroll back
When you get to the function you want to adjust you will push the
OK
key to select that function. (When the time
is selected the numbers will flash on and off. When it is not selected blocks will flash over the time.)
Then use the
+
and
–
keys to adjust the timer up and down in 0.1 second increments.
Summary of Contents for 510
Page 2: ...2 Safety Installation Operation Maintenance CBE 510 BULK BAGGER ...
Page 11: ...11 CHAPTER 1 GENERAL INFORMATION ...
Page 15: ...15 Chapter 2 INSTALLATION ...
Page 19: ...19 Chapter 3 LOAD CELL WIRING ...
Page 25: ...25 Chapter 4 Component Description ...
Page 27: ...27 Chapter5 Optional Equipment ...
Page 29: ...29 CHAPTER 6 SETUP OPERATING PROCEDURES ...
Page 36: ...36 CHAPTER 7 PLC and AVERY 405 ADJUSTMENTS ...
Page 40: ...40 Chapter 8 WEIGH CONTROLLER and ADJUSTMENTS ...
Page 44: ...44 CHAPTER 9 MAINTENANCE ...
Page 46: ...46 CHAPTER 10 TROUBLESHOOTING ...
Page 50: ...50 ILLUSTRATED PARTS PAGES ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 SCHEMATICS AND DRAWINGS ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...