23
|
P a g e
cascadesciences.com
|
Tel. 503 847-9047
INSTALLATION
L
EVELING
Install the 4 leveling feet in the 4 corner holes on the bottom of the oven.
The oven must be level and stable for safe operation.
Note:
To prevent damage when moving the unit, turn all 4 leveling feet so that the leg of each foot
sits inside the unit.
I
NSTALLATION
C
LEANING
The unit was cleaned at the factory, but not sterilized. It may have been exposed to contaminants en route
during shipping.
•
Remove all wrappings and coverings from shelving prior to cleaning and installation.
•
Do not clean with deionized water.
•
topic in the User Maintenance section (see page 47) for
more information on how to clean the oven chamber prior to putting the unit into operation.
I
NSTALL THE
O
VEN
Place the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
•
Verify that the oven stands level and does not rock. Adjust the leveling feet as needed.
•
A qualified technician may now connect the oven to its power source
.
Summary of Contents for CVAC-9.3
Page 1: ...Installation Operation Manual CVAC 9 3 Vacuum Oven ...
Page 5: ...5 P a g e cascadesciences com Tel 503 847 9047 REPLACEMENT PARTS 53 ...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS ...
Page 8: ...8 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS ...
Page 12: ...12 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION ...
Page 28: ...28 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION ...
Page 30: ...30 P a g e cascadesciences com Tel 503 847 9047 GRAPHIC SYMBOLS ...
Page 34: ...34 P a g e cascadesciences com Tel 503 847 9047 CONTROL OVERVIEW ...
Page 46: ...46 P a g e cascadesciences com Tel 503 847 9047 OPERATION ...
Page 54: ......