Installing the UPC Open
UPC Open
Carrier Proprietary and Confidential
CARRIER CORPORATION ©2017
Installation and Integration Guide
All rights reserved
4
1
Mount the controller
(page 4).
2
Wire the controller for power
(page 4).
3
Set the controller's address
(page 5).
4
Wire the controller to the BACnet MS/TP or BACnet ARC156 network
(page 5).
5
Wire the controller to the CCN network
(page 5).
6
Wire devices to the controller's Rnet port
(page 8).
Mounting the UPC Open
WARNING
When you handle the UPC Open:
•
Do not contaminate the printed circuit board with fingerprints, moisture, or any foreign material.
•
Do not touch components or leads.
•
Handle the board by its edges.
•
Isolate from high voltage or electrostatic discharge.
•
Ensure that you are properly grounded.Screw the UPC Open into an enclosed panel using the mounting slots
on the coverplate. Leave about 2 in. (5 cm) on each side of the controller for wiring. Mounting hole dimensions 4.8
in. (12.2 cm) between mounting slot center lines.
Wiring the UPC Open for power
CAUTION
The UPC Open is powered by a Class 2 power source. Take appropriate isolation measures when
mounting it in a control panel where non-Class 2 circuits are present. The UPC Open is a half wave device. Half
wave and full wave devices
cannot
share power. Examples of a full wave device are a CVC or ICVC in an applied
chiller.
Carrier controllers can share a power supply as long as you:
• Maintain the same polarity
• Use the power supply only for Carrier Open controllers
Installing the UPC Open