CL-2
B. Preliminary Equipment Check
IS THERE ANY SHIPPING DAMAGE? ____________________________ IF SO, WHERE ___________________________
_________________________________________________________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP?________________________________
UNIT IS LEVEL IN ITS INSTALLATION
UNIT IS SUPPLIED WITH THE PROPER CONTROL VOLTAGE _________________VAC
ELECTRICAL CIRCUIT WIRING HAS BEEN SIZED AND INSTALLED PROPERLY
UNIT GROUND WIRE HAS BEEN CONNECTED
ELECTRICAL CIRCUIT PROTECTION HAS BEEN SIZED AND INSTALLED PROPERLY
ALL TERMINALS ARE TIGHT
ALL CABLES AND THERMISTORS HAVE BEEN INSPECTED FOR CROSSED WIRES
ALL PLUG ASSEMBLIES ARE TIGHT
CHECK CHILLED WATER SYSTEM
ALL CHILLED WATER VALVES ARE OPEN
ALL FLUID PIPING IS CONNECTED PROPERLY
ALL AIR HAS BEEN VENTED FROM THE SYSTEM
CHILLED WATER PUMP (CWP) IS OPERATING WITH THE CORRECT ROTATION
CWP AMPERAGE:
RATED: ___________________________
ACTUAL:____________________________________
PUMP PRESSURES: INLET: ____________________________
OUTLET: ____________________________________
CHECK CONDENSER SYSTEM (30HXC ONLY):
ALL CONDENSER WATER VALVES ARE OPEN
ALL CONDENSER PIPING IS CONNECTED PROPERLY
ALL AIR HAS BEEN VENTED FROM THE SYSTEM
CONDENSER WATER PUMP IS OPERATING WITH THE CORRECT ROTATION
CONDENSER WATER PUMP AMP: RATED: ______________
ACTUAL:____________________________________
PUMP PRESSURES:
INLET: _______________
OUTLET: ____________________________________
CHECK REMOTE CONDENSER SYSTEM (30HXA ONLY):
ALL REFRIGERANT PIPING IS CONNECTED PROPERLY
CHILLER REFRIGERANT PIPING AND CONDENSER HAS BEEN EVACUATED, AS REQUIRED