Document revision history
AppController
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
25
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
Change description
Code*
1/23/19
Wiring devices to the AppController's
Rnet port
Removed star configuration from the first paragraph.
X-TS-TS-O
New look, no content changes
Added surge CAUTION to Protection specification.
X-TS-AK-E-CC
12/14/17 Analog outputs
Corrected impedance from 500 Ohms to 2000 Ohms
C-AE-ZL-E-WB
2/15/17
Changed name of sensors from WS to wireless
C-D
1/16/17
Specifications
Wiring devices to the <ALCProduct>'s
Rnet port
Number of SPT and ZS sensors clarified to 10 (5 per control
program)
C-TS-JN-BR
ZS sensor overview
SPT sensor overview
Simplified. Detailed descriptions are available in specified
manuals. Corrected total number of ZS sensors.
C-D-RD
Wireless sensor overview
To install the Wireless Adapter for
wireless sensors
New Topics
C-D
Wiring devices to the AppController's
Rnet port
Added Wireless Adapter for wireless sensors
C-D
Input wiring specifications
Added Wireless Adapter for wireless sensors
C-D
To wire the controller to the network
Added BACnet ARC156 connection information
C-D-OC
Wiring for communications
Changed from Wiring the AppController to the MS/TP network
C-D-OC
Specifications
Added BACnet ARC156 connection and Wireless Adapter for
Carrier wireless sensors. Corrected SPT information.
C-D-OC
Cover
What is the AppController?
Changed to latest controller image.
C-D
6/2/16
Specifications
Corrected error. Max number of third party integration points
removed.
C-TS-RD-E
2/19/16
Local access to the AppController
Added USB Link wiring caution.
C-TS-RD-E-JH
12/2/15
Inputs
Corrected error - changed 8 inputs to 6 inputs.
C-TS-RR-E
8/14/14
Restore factory defaults
Added information on using the Factory Defaults jumper
C-D-LJ-E-RD
To wire the Equipment Touch to the
AppController
Added Caution to maintain polarity and use the power supply
only for Carrier controllers
C-TS-RD-E
Specifications
Maximum number of BACnet third-party integration points using
Snap - changed to unlimited, depending on memory
Power - removed references to BACview
Rnet port - added a note that number of possible ZS sensors you
can have with an Equipment Touch is 15
Added Equipment Touch and removed BACview
Local Access port - removed BACview, added Equipment Touch
C-D-LJ-O
Wiring devices to the Rnet port
Changed from "Wiring a communicating zone sensor to the
AppController"
Removed references to BACview
Connecting an SPT sensor
Removed BACview and added Equipment Touch
To wire an Equipment Touch to the
AppController
New topic
BACview devices
Removed references and topics
Local Access to the AppController
Removed BACview and added Equipment Touch
* For internal use only
Document revision history