SEQUENCE OF OPERATION

Turn on power to indoor and outdoor units. Transformer is

energized.
On a call for cooling, thermostat makes circuits R--Y and R--G.

Circuit R--Y energizes contactor, starting outdoor fan motor and
compressor circuit. R--G energizes indoor unit blower relay,

starting indoor blower motor on high speed.

NOTE

: To achieve the rated system performance, the indoor unit

or the thermostat must be equipped with a time delay relay
circuit.
When thermostat is satisfied, its contacts open, de--energizing
contactor and blower relay. Compressor and motors stop. If

indoor unit is equipped with a time--delay relay circuit, the indoor
blower will run an additional 90 sec to increase system efficiency.

STEP 11. —

Check Charge

UNIT CHARGE

Factory charge and charging method are shown on unit
information plate. Charge Puron units with cylinder in upright

position and a commercial--type metering device in manifold
hose. Charge refrigerant into suction line.

NOTE

: If subcooling charging conditions are not favorable,

charge must be weighed in accordance with unit rating plate,

±

0.6

oz/ft. of 3/8--in. liquid line above or below 15 ft., respectively.
Favorable conditions fall within the ranges given on the charging
chart on the outdoor unit plate.

NOTE

: In longline applications, see Application Guideline for

special charging requirements.
EXAMPLE:
To calculate additional charge required for a 25--ft. line set:

25 ft. -- 15 ft. = 10 ft. X 0.6 oz/ft. = 6 oz. of additional charge.

COOLING ONLY PROCEDURE

This system requires charging by the subcooling method.

1. Operate unit a minimum of 10 minutes before checking

charge.

2. Measure liquid service valve pressure by attaching an

accurate gage to service port.

3. Measure liquid line temperature by attaching an accurate

thermistor type or electronic thermometer to liquid line

near outdoor coil.

4. Refer to unit rating plate for required subcooling

temperature.

5. Refer to Table 3. Find the point where required subcooling

temperature intersects measured liquid service valve

pressure.

6. To obtain required subcooling temperature at a specific

liquid line pressure, add refrigerant if liquid line
temperature is higher than indicated or reclaim refrigerant
if temperature is lower. Allow a tolerance of

±

3

_

F.

STEP 12. —

Final Checks

IMPORTANT

: Before leaving job, be sure to do the following:

1. Ensure that all wiring is routed away from tubing and

sheet metal edges to prevent rub--through or wire
pinching.

2. Ensure that all wiring and tubing is secure in unit before

adding panels and covers. Securely fasten all panels and
covers.

3. Tighten service valve stem caps to 1/12--turn past finger

tight.

4. Leave Owner’s Manual with owner. Explain system

operation and periodic maintenance requirements outlined

in manual.

5. Fill out

Dealer Installation Checklist and place in

customer file.

24AC

A

Summary of Contents for 24ACA

Page 1: ...2 INSTALLATION 3 9 Step 1 Check Equipment Jobsite 3 Step 2 Install on Solid Pad 3 Step 3 Clearance Requirements 3 Step 4 Operating Ambient 3 Step 5 Install TXV 3 4 Step 6 Make Piping Connections 4 7...

Page 2: ...rate at higher pressures than standard R 22 systems To avoid damage to the unit or possible personal injury do not use R 22 service equipment or components on Puron equipment INSTALLATION RECOMMENDATI...

Page 3: ...ufacturer specifications STEP 3 Clearance Requirements When installing allow sufficient space for airflow clearance wiring refrigerant piping and service Allow 30 in clearance to service end of unit a...

Page 4: ...placing TXV on R 22 Indoor Coil 1 Pump system down to 2 psig and recover refrigerant 2 Remove coil access panel and fitting panel from front of cabinet 3 Remove TXV support clamp using a 5 16 in nut d...

Page 5: ...nd condition Rated tubing diameters shown in Table 1 recommended up to 80 ft See Product Data for acceptable alternates vapor diameters and associated capacity losses For tubing requirements beyond 80...

Page 6: ...the indoor coil 2 Wrap filter drier with damp cloth 3 Braze filter drier to above 5 liquid tube Flow arrow must point towards indoor coil 4 Connect and braze liquid refrigerant tube to the filter dri...

Page 7: ...utdoor unit has not shifted during shipment Ensure tubes are not rubbing against each other or any sheet metal Pay close attention to feeder tubes making sure wire ties on feeder tubes are secure and...

Page 8: ...ine Section Residential Split System Air Conditioners and Heat Pumps Using Puronr Refrigerant STEP 9 Install Electrical Accessories Refer to the individual instructions packaged with kits or accessori...

Page 9: ...cial charging requirements EXAMPLE To calculate additional charge required for a 25 ft line set 25 ft 15 ft 10 ft X 0 6 oz ft 6 oz of additional charge COOLING ONLY PROCEDURE This system requires char...

Page 10: ...ons On On On Off Off Off No 230V power to unit Check 230V disconnect circuit breaker Check 230V L1 L2 wire connections On On On On Off Off Contactor open Check Contactor and replace if necessary Check...

Page 11: ...8 76 74 72 70 68 266 80 78 76 74 72 70 274 82 80 78 76 74 72 283 84 82 80 78 76 74 291 86 84 82 80 78 76 299 88 86 84 82 80 78 308 90 88 86 84 82 80 317 92 90 88 86 84 82 326 94 92 90 88 86 84 335 96...

Page 12: ...s S Do not install a suction line filter drier in liquid line S POE oils absorb moisture rapidly Do not expose oil to atmosphere S POE oils may cause damage to certain plastics and roofing materials S...

Reviews: