7310 Series Operations Manual
REV E 11-19-19
Page 25 of 131
OPERATION
Before the unit can be commissioned for use, make sure that the following steps have
been completed:
- Chamber is properly installed and level.
- The appropriate utilities connected to the chamber.
With the above mentioned steps complete, the power switch located on the right side,
near the top of the unit exterior, can be turned on.
Within a few minutes, the temperature will begin to approach setpoints. Here is an
overview of the home screen.
Setpoint
Menu
Settings
Menu
Speaker
Lockout
icon
Parameter
Display
Zones
Light
Cycle
Menu
Actual
Light
Actual
Temperature
Status Bar
Day / Time
Trend
Graph
Summary of Contents for 7310-22
Page 1: ......
Page 115: ...7310 Series Operations Manual REV E 11 19 19 Page 115 of 131 ELECTRICAL SCHEMATICS ...
Page 116: ...7310 Series Operations Manual REV E 11 19 19 Page 116 of 131 ...
Page 117: ...7310 Series Operations Manual REV E 11 19 19 Page 117 of 131 ...
Page 118: ...7310 Series Operations Manual REV E 11 19 19 Page 118 of 131 ...
Page 119: ...7310 Series Operations Manual REV E 11 19 19 Page 119 of 131 ...
Page 120: ...7310 Series Operations Manual REV E 11 19 19 Page 120 of 131 ...
Page 121: ...7310 Series Operations Manual REV E 11 19 19 Page 121 of 131 ...
Page 122: ...7310 Series Operations Manual REV E 11 19 19 Page 122 of 131 ...
Page 123: ...7310 Series Operations Manual REV E 11 19 19 Page 123 of 131 ...
Page 124: ...7310 Series Operations Manual REV E 11 19 19 Page 124 of 131 ...