INSTALLATION
Unpacking
Your new unit has been thoroughly packaged to avoid shipping damage. However, the
unit should be fully inspected upon arrival before signing for receipt. If the package has
visual damage, notes should be made on the freight bill and signed by the delivery
company. In the event of concealed damage after the unit is uncrated, keep the carton
and packaging material. Call the shipping company within 7 days of receipt, request
inspection and retain a copy of the inspection report.
Caron provides full on-site installation services for all models. Our installation services
guarantees the proper set-up and startup of all equipment. Please contact the Service
Department at 740-373-6809 or
For detailed instructions on how to safely remove the chamber off the shipping pallet,
see document located on the chamber.
Choosing a Location
To ensure proper operation, the unit must be located on a firm level surface, capable of
supporting approximately 1,000 pounds. The unit should be located in an 18°C – 25°C
ambient area and where there is no direct airflow from heating and cooling ducts as well
as out of direct sunlight. Allow four inches of clearance on all sides of the product to
allow for connections and airflow.
Depending on user setpoints, these units may not need a drain. Drains are
recommended at temperatures below 15°C. Units with optional humidity control
(HUMD312, HUMD313 & HUMD314) need a water source and drain.
The unit requires a dedicated electrical connection. Power requirements vary depending
upon the chamber model, see Connecting Electrical Power section.
Choose a location where these facilities are, or can be made available. If a water
source or a drain is not available, contact Caron customer service and ask about our
CRYS102 product line or click this web link for information on the product:
This product weighs in excess of 700 pounds.
Ensure that sufficient resources are available to
safely move the product.
Summary of Contents for 7310-22
Page 1: ......
Page 115: ...7310 Series Operations Manual REV E 11 19 19 Page 115 of 131 ELECTRICAL SCHEMATICS ...
Page 116: ...7310 Series Operations Manual REV E 11 19 19 Page 116 of 131 ...
Page 117: ...7310 Series Operations Manual REV E 11 19 19 Page 117 of 131 ...
Page 118: ...7310 Series Operations Manual REV E 11 19 19 Page 118 of 131 ...
Page 119: ...7310 Series Operations Manual REV E 11 19 19 Page 119 of 131 ...
Page 120: ...7310 Series Operations Manual REV E 11 19 19 Page 120 of 131 ...
Page 121: ...7310 Series Operations Manual REV E 11 19 19 Page 121 of 131 ...
Page 122: ...7310 Series Operations Manual REV E 11 19 19 Page 122 of 131 ...
Page 123: ...7310 Series Operations Manual REV E 11 19 19 Page 123 of 131 ...
Page 124: ...7310 Series Operations Manual REV E 11 19 19 Page 124 of 131 ...