40
ENG
“heaterSteam” +0300075EN - rel. 1.2 - 29.09.2015
Fig. 10.h
14.
clean the anti-adhesive fi lm that may be present on the inner walls of
the boiler (see next section);
15.
clean and remove the lime from the boiler and reinsert the fi lm
(where needed);
16.
after you have completed the maintenance interventions, reinstall
the boiler following the operations described above reversely.
Models UR020-UR080:
1.
loosen the screws (fi gure 10.i);
Fig. 10.i
2.
unthread the top panel and remove it;
1
Fig. 10.j
3.
loosen the seal strip and remove the steam pipe (1);
I
8
A
B
5
7
4
2
3
1
Fig. 10.k
4.
disconnect level gauge connector (2);
5.
remove the pressure regulation pipe (3), connected to the level
gauge, from boiler cover;
6.
remove the cover that protects the heaters (5), loosen the fastening
nuts and remove the wires and the ground cable (7);.
7.
disconnect the probe connector and remove the NTC probe from
the well (4);
8.
remove the screw (A) and the screws of the rear fastening bracket (B);
9.
remove the boiler sliding it onto the guides (8);
10.
remove the outer insulating mattress;
11.
unscrew and remove the nuts (10) to raise the cover and remove it
from the boiler;
10
Z
Fig. 10.l
Fig. 10.m
12.
to replace the heaters refer to the next section;
13.
remove the spacer (D) located on the bottom of the boiler;
14.
clean the heaters (see the next section);
15.
the heaters (R) can also be cleaned without unmounting the
top cover; this can be achieved by removing the front fl ange and
loosening the fatening nuts (Z);
16.
now remove the fl ange with the fi lter (C);