66
ENG
“heaterSteam” +0300075EN - rel. 1.2 - 29.09.2015
12.8 Production control via variables A52
and A53
a.
Through the network, just after switching on the humidifi er, set the
digital variable D15 = 0 (there is no need to repeat this step during
operation, unless the humidifi er is turned off );
b.
Set the internal variable I32=3;
c.
Set the variable I9 (A0) = 0,1,2,3,4 for the on / off control, proportional
control, control with ambient humidity probe, ambient probe control
humidity and limit probe, control with ambient temperature sensor;
d.
Send the request ambient/signal probe in the analog variable A52 in
the format from 0000 to 1000 (0% to 100%). Refer to the chart below
for I9 (A0) = 1; same applies to I9 (A0) =0,2,3,4;
e.
If I9 (A0) = 3, send the limit probe signal in the analog variable A53
with format from 0000 to 1000 (0.0% to 100.0%)
ON
OFF
A52 variable
Steam_Pr
70.0
30.0
A0=0
Fig. 12.b
P0
Steam_Pr
Pm
A52 variable
Pre_heat
hy
hy
Bp
0%
OFF
ON
A0=1
Fig. 12.c
St
Pm
P0
Steam_Pr
P1
hy A52 variable
Fig. 12.d
P7
Pm
P0
Steam_Pr_Lim
P8
P8/10
A53 variable
Fig. 12.e
Legend: Steam_pr = steam production, Pre_heat _= pre-heating, Steam_Pr_Lim =
steam production limit
Summary of Contents for heaterSteam UR Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 70: ...70 ENG heaterSteam 0300075EN rel 1 2 29 09 2015 Notes...
Page 71: ......