docs.carbide3d.com
10/02/2020
Version 1.0
39
Secure Cables at Y1-Carriage and HDZ
Required Components:
Item
Description
Qty
T
4” Cable Ties
Several
1.
Secure the cables crossing the Y1-carriage plate. See
Fig. 41
.
a.
Tuck all seven cables, one at a time, into the
cutout at the top of the Y1-carriage plate.
b.
Use two (2) cable ties, one on each side of
the cutout, to secure the cables in place.
2.
Secure the cables at the rear of the HDZ. See
Fig. 42
.
a.
Bundle the X- and Z-cables at the rear of the
HDZ.
b.
Use a few cable ties to secure the cables.
Figure 41
Figure 42
Shapeoko 3 Machines:
Skip ahead to the “Secure Cables Along the X
-Rail
” section on page