docs.carbide3d.com
10/02/2020
Version 1.0
23
Secure Cables Along the X-Rail
Cable Cleanup
Required Components:
Item
Description
Qty
T
4”
Cable Ties
Several
1.
Tidy up the cables along the rear of the X-rail. See
Fig. 23
.
a.
Secure the loose cables to the four self-
adhesive cable tie mounts already
attached to the back of the X-rail.
Post Installation Instructions
Please see
the “P
ost Installation
”
chapter on page 41 for instructions on updating Carbide Motion, testing the new
proximity switches, homing your Shapeoko, and re-calibrating the BitSetter.
Figure 23