7
12/18/2021 v1.0
Step 1: Unpack the Machine
WARNINGS:
•
Use caution when lifting the machine; it
weighs over 240 lbs.
•
Do NOT move the machine by lifting from the
ballscrews, linear rails, or drag chains.
LIFTING RECOMMENDATIONS:
•
Remove the outer Hybrid Table slats and
extrusions before moving.
•
Lift from the front edge of the X-extrusion and
the front end of the two Y-extrusions. See
Fig. 1
.
Unbox the Shapeoko HDM
To remove the machine from the packing crate:
1.
Lift the sides of the packing crate to remove
them.
2.
Remove the two outer MDF slats and aluminum
extrusions from the Hybrid Table.
a.
Remove the twenty-four (24) M6
screws (4 per MDF slat and 8 per
aluminum extrusion).
3.
Use a #2 Phillips-head screwdriver to remove
the two (2) screws securing the machine to the pallet. Screw location is marked by red arrows in
Fig. 2
.
4.
With the help of another person (or two), lift the machine from the pallet.
a.
Lift from the front edge of the X-extrusion and the front end of the two Y-extrusions. See
Fig. 1
.
b.
Try to keep the machine level when lifting.
5.
Set the machine on a sturdy, level worksurface.
6.
Re-install the two outer aluminum extrusions and MDF slats.
Figure 1
Figure 2
Summary of Contents for Shapeoko HDM
Page 1: ...Shapeoko GETTING STARTED GUIDE HDM...
Page 2: ......