21
32) Open the controller box again and temporarily place the high voltage PCB on the
controller box.
33) Remove the 2 screws [1], 4 bosses [2] and 1 hook [3]. Release the 4 harnesses of the high
voltage PCB and detach the hopper unit (Y)/ (M)/ (C).
[Caution] When installing the hopper unit (Y)/ (M)/ (C), go through the following
steps so that no gap is found at the main body's rear side plate.
1) Install the hopper unit (Y)/(M)/(C) with 2 screws aligning the position with the hook
and 4 bosses on the main body.
2) Push in the shaft at the upper left of the hopper tray unit all the way to the rear
until it stops, and the check that the remained shaft length is 37.5 mm or more. If not,
reinstallation is required because the hopper unit (Y)/(M)/(C) is not contact with the
host machine's rear side plate.
34) Assemble the parts in reverse order from step 32) to 1).
YMC