e-Support
Filename:
TP11 249.pdf
Date:
07-19-11
Page 5 of 8
4.
Pull out the transmission shaft [A] together with the deck lifting plate wire.
5.
Replace the old transmission shaft [A] with the the new type (FC8-2530-000) [6].
6.
Install the new transmission shaft taking care to install the bearing [13] and e-ring [7] in order for
both front and rear sides.
When winding the deck lifting plate wire around the front and rear lift pulleys, be careful to match the
direction of the windings.
NOTE: