
4-2) Loosen the 2 screws [1] on the operation feed motor (M26), move the motor in the direction of the arrow until it stops and
fully tighten the screws.
4-3) With the 2 screws [2] that were removed in the step 4-1), temporarily secure the paper delivery drive assembly (L).
4-4) Move the paper delivery drive assembly (L) in the direction of the arrow until it stops and fully tighten the 2 screws [2].
48
Summary of Contents for imageRUNNER ADVANCE 8500 series
Page 37: ...iR ADV 8585i 120V USA G SWP00501 iR ADV 8505 220V CN SWE00105 33 ...
Page 53: ...4 5 Make some prints and check that the above issue does not occur 49 ...
Page 66: ...2 Remove the grate shaped lower guide 2 screws 2 62 ...
Page 70: ...7 Reattach the metal plate 1 Screw 2 x1 8 Loosen the 2 screws 1 66 ...
Page 74: ...iR ADV 8505 220V CN To be informed as soon as identified 70 ...
Page 90: ... Service parts FM4 0889 010 solenoid assembly 86 ...