COPYRIGHT © 1999 CANON INC.
CANON GP605/605V REV.0 JAN. 1999 PRINTED IN JAPAN (IMPRIME AU JAPON)
xiv
CHAPTER 11 SIDE PAPER DECK
I .
SELECTING THE SITE ............ 11-1
II . UNPACKING AND INSTALLATION
.................................................. 11-4
A.
Unpacking ............................ 11-5
B.
Mounting the Scanner.......... 11-8
C. Mounting the Fixing Assembly
............................................. 11-9
D. Mounting the Corona Assemblies
........................................... 11-10
E.
Checking the Developing
Assembly ........................... 11-13
F.
Mounting the Pick-Up Assembly
........................................... 11-14
G. Supplying Toner ................. 11-15
H. Mounting the ADF .............. 11-16
I.
Checking Images/Operations
(user mode)........................ 11-17
J.
Changing the Size of the Front
Deck (right and left) ........... 11-20
III . RELOCATING THE COPIER
................................................ 11-21
IV . INSTALLING THE CONTROL
CARD V ................................... 11-22
1.
Removing the Control Panel
...................................... 11-22
2.
Before Installing the Control
Card .............................. 11-24
3.
Installing the Control Card
...................................... 11-25
V . INSTALLING THE REMOTE
DIAGNOSTIC DEVICE II ........ 11-27
VI . INSTALLING THE COPY DATA
CONTROLLER-A1 .................. 11-36
A.
Setting the Board ............... 11-36
B.
Installing to the Copier ....... 11-39
C. Checking the Operation ..... 11-42
VII . INSTALLING THE CASSETTE
HEATER (FOR 120V MODEL:
CASSETTE HEATER UNIT 15)
................................................ 11-53
A.
Installing to the Copier ....... 11-53
CHAPTER 12 MAINTENANCE AND SERVICING
I.
PERIODICALLY REPLACED
PARTS ...................................... 12-1
II.
DURABLES TABLE .................. 12-2
A.
Copier .................................. 12-2
B.
Side Paper Deck .................. 12-5
III. SCHEDULED SERVICING CHART
.................................................. 12-6
IV. SCHEDULED SERVICING ITEMS
.................................................. 12-8
A.
Copier .................................. 12-8
B.
Work Steps ........................ 12-11
1.
Work 1 .......................... 12-11
2.
Work 2 .......................... 12-12
CHAPTER 13 TROBLESHOOTING
I .
GUIDE TO TROUBLESHOOTING
TABLES .................................... 13-1
A . Image Adjustment Basic
Procedure ............................ 13-3
B . Points to Note for Scheduled
Servicing .............................. 13-6
II . STANDARDS AND ADJUSTMENTS
.................................................. 13-7
A.
Adjusting Images ................. 13-7
1.
Adjusting the Image Position
........................................ 13-7
2.
Adjusting the Left/Right Image
Margin ............................. 13-8
3.
Adjusting the Image Leading
Edge Margin ................. 13-12
4.
Adjusting the Left/Right Non-
Image Width .................. 13-12
5.
Adjusting the Image Leading
...................................... 13-13
Summary of Contents for GP605
Page 3: ......
Page 4: ......
Page 24: ......
Page 56: ......
Page 78: ......
Page 116: ......
Page 124: ......
Page 148: ......
Page 150: ......
Page 168: ......
Page 170: ......
Page 250: ......
Page 252: ......
Page 342: ......
Page 390: ......
Page 392: ......
Page 464: ......
Page 466: ......
Page 512: ......
Page 514: ......
Page 572: ......
Page 574: ......
Page 590: ......
Page 592: ......
Page 854: ......
Page 870: ......
Page 874: ......